Custom 10’ explosion-proof paint storage unit for offshore oil & gas sector

Case study

The project

Green Box Containers was engaged by Penta Global to design and manufacture a specialised.

Green Box Containers was engaged by Penta Global to design and manufacture a specialised 10-foot explosion-proof paint storage unit for use in a highly hazardous offshore environment for ADNOC. The client required a solution that complied with Zone 2 hazardous area standards to ensure the safe storage of flammable paint materials on the offshore platform.

Client Requirements

The client outlined a clear set of requirements to ensure the unit complied with ADNOC’s safety and operational standards:

  • Compliance with ATEX Zone 2 standards for hazardous environments
  • Safe and secure enclosure for storing flammable and hazardous paint materials
  • Integration of explosion-proof electrical fittings, fire alarm, and fire suppression systems
  • Inclusion of a UPS system, despite the challenge of sourcing explosion-proof variants
  • Full documentation and technical validation prior to production

Challenges

  • Sourcing Explosion-Proof Components: All electrical fittings had to be imported from Europe, which required us to manage extended lead times and deliver within the project duration.
  • Fire Safety Systems: Identifying suitable fire alarm, suppression systems that met offshore safety standards, and approved vendors to supply these systems.
  • UPS Integration: The client requested a UPS system, but explosion-proof models were unavailable within the project duration.
  • Restricted Offshore Access: Posed a challenge to validate performance and compliance of project equipment and solution.

Solutions

  • Sourcing Explosion-Proof Components: Despite extended procurement timelines, Green Box ensured timely sourcing and integration of all explosion-proof electrical fittings.
  • Fire Safety Systems: Certified vendors were engaged to supply fire alarm and suppression systems that fully met offshore safety requirements.
  • UPS Integration: To address the UPS challenge, Green Box proposed alternative safety measures that achieved the intended operational requirements without compromising safety.
  • Restricted Offshore Access: A comprehensive pre-dispatch inspection was conducted in coordination with the client and ADNOC to validate performance and compliance.

Execution and Outcome

  • Detailed drawings, specifications, and technical documentation were submitted and approved prior to production.
  • The unit was manufactured and completed on schedule, with final inspection conducted at Green Box’s facility.
  • Although the inspection and pickup process took longer than expected, the client expressed high satisfaction with the quality and performance of the unit.
  • The client indicated future demand for similar units, validating the success of this first-time explosion-proof project.

Key Features and Benefits

The unit was equipped with a range of specialised features to ensure safe, compliant, and reliable offshore operation.

  • Explosion-Proof Construction: Engineered to contain and prevent the ignition of flammable materials.
  • Fire-Resistant Materials: Built with certified non-combustible materials to minimise fire risk.
  • Advanced Ventilation: Designed to control flammable vapours and maintain safe internal conditions.
  • Spill Containment: Integrated systems prevent environmental contamination.
  • Weatherproof Design: Suitable for harsh offshore conditions including extreme temperatures and humidity.
  • Fire Suppression Systems: Equipped with certified systems for rapid response in case of fire.
  • Electrical Safety: All fixtures and wiring are explosion-proof to ensure operational reliability.

Conclusion

This project marks a key milestone for Green Box Containers in delivering explosion-proof solutions for Oil & Gas and other sectors in the UAE and the region. The successful execution and excellent ADNOC and Penta Global feedback, has established a strong foundation for future projects in hazardous material offshore storage solutions.

Words from clients

Customer rating 4.7 out of 5

Green Box Containers equals quality, commitment and dedication

We are very satisfied with the quality Green Box Containers provided. The team was committed to our needs and dedicated to providing the best quality. Everything went smoothly from proposal to installation.

Manifold systems international FZC

Green Box Containers meets your expectations

We were happy with the timely service the Green Box Containers team extended to us and we are satisfied with the end product. The team at Green Box Containers has met our expectations.

The Galleria Investment LLC

Green Box Containers delivers timely services that fit like a glove

We would like to send our thanks and appreciation for producing the fabrication in a very timely manner and for the quality of the finished product, which fitted as they say…. 'like a glove'.

Green Eco Technologies

Green Box Containers ensures flawless execution and timely delivery

Thank you for your outstanding work on the ADNOC Truck Layby project. Your timely delivery of container units across six locations in Dubai, adherence to deadlines, and thorough documentation ensured a smooth approval process and seamless completion.

Amana Contracting & Steel Building Co. WLL